Cloud migration
Your applications and data leave the office server for supervised, backed-up infrastructure.
- Inventory and cutover plan
- Migration without service interruption
- Backups that are tested, not just scheduled
Ageing servers, shared spreadsheets, tasks copied from one tool to another: we replace what breaks with infrastructure that is looked after and workflows that run on their own, without daily supervision.
Your applications and data leave the office server for supervised, backed-up infrastructure.
Tasks copied by hand go on autopilot, with a readable log of what ran.
When no off-the-shelf software fits, we build the exact tool your teams need.
We watch what we deploy and step in before you notice the outage.
The office server went down with every power cut. Applications and data were migrated to the cloud over one weekend, with a rollback plan prepared but never used.
Three days of manual consolidation every month replaced by a report generated automatically and sent on the first of the month.
The CRM, invoicing and mailbox did not talk to each other. Workflows now connect them, with an execution log the team can read.
Production readings entered on a tablet feed a dashboard management can consult in real time.
Backups existed but had never been restored. We put a monthly test restore in place, with an alert on failure.
Inventory of what exists, its dependencies and its real risks, without jargon.
1 to 2 weeksMigration order, maintenance window and rollback procedure.
1 weekProgressive cutover, load testing and backup verification.
2 to 6 weeksProbes, alerts, security updates and a monthly review.
OngoingNo, and it is rarely a good idea. We migrate in batches, starting with the least risky, with a rollback procedure prepared at every step.
It keeps running. The cutover happens in a short, announced window, usually outside business hours, once the tests have passed on a copy.
It depends on load, but we size for reality rather than for the peak, and we give you the estimated monthly cost before starting, not after the first invoice.
Yes, in most cases. We connect your existing tools through their APIs rather than replacing them, which avoids retraining your teams.
We do, if you have taken maintenance or the ongoing partnership. In most cases the probes alert us before your users notice.
Describe your need in four steps: you leave with a budget range and a call slot.
Estimate my project